Projects » Hotels and Resorts
Hotels and Resorts
Al Zorah Resort One, Ajman, U.A.E. - Six
Construct
A five star complex to be developed in three phases on
the sea front and spread area is about 5.4 million Sqm. The structure
includes Main Hotel Building, Golf Course 18 hole, All Day Dining, Spa,
Villas ( 02 Bedrooms and 03 Bedrooms), Restaurants, Gyms etc.
Pamposh has been awarded the substantial part of execution of structural
concrete works on item rate basis (Labour Only) by the main contractor viz;
M/s Six Construct. Pamposh started the actual works on site in Dec 2014.
Four Seasons Hotel, Bahrain
Four Seasons, a Canadian based company made an addition
to the global network of its hotels at Bahrain Bay, which will occupies the
central island where guests will have stunning 360 degree view of the
community and the Manama skyline. The striking design has made it an iconic
landmark for the Kingdom of Bahrain and has set new standards in comfort,
luxury and style.
In Oct-2011, Bahrain Bay Development awarded the construction contract of
201 mtr. tall hotel complex to M/s Six Construct with target completion date
of Dec-2014. M/s Six Construct engaged Pamposh in Oct-2012, for Deployment
and Management of approximate three hundred Indian highly skilled operatives
for execution of structural concrete works of the Hotel complex.
Pamposh also executed Screed works at Podium level.

Pamposh
was hired to do modification/ repair works on existing villas/
bungalows/staff quarters/ swimming pool etc. Pamposh was responsible for all
Civil Structural & Finishing works viz Form works/ steel works/
concreting/ block masonry/ plaster/tiling/stone fixing/marble/wood work/
landscaping and external beautification works.
Our Clients : M/s QDVC (Joint Venture Company of Qatar Diar and Vincee
Constructions)
A simple rectangular seven storey hotel building,
Constructed at Jabel Ali Free Zone Area where in Pamposh was subcontracted
the execution of all the structural works. Conventional construction methods
including precast technology has been opted for the early completion of the
low cost budget hotel building.
Pre-cast panel in exterior walls, and hollow core slabs with topping
constitute the slab for every floor. The cast-in-situ structural concrete
work was minimized to 3500 cum. only Interior columns have been minimized
and the load has been transfer through two primary and ten secondary beams
to the exterior columns and core walls. Each floor has area of 1085 sqm.
Principal employer is M/s Khansaheb Civil Engineering, Dubai UAE.
Pamposh executed part of the Structural Concrete Works
for the 85 level Hotel Apartment Tower being constructed for M/s Plazzso
Versace. The building is oval shaped and each floor is 1600 sqm. area. The
structural height of Tower is over 350 mtrs. The tower is situated next to
the Plazzo Vercase Hotel at Dubai Creek. Dubai Creek is one of the tallest
residential buildings of world.
70000 cum. of concrete and over 9000 tones of has been used in the
structure. All the works were mechanized and the shuttering used was Jump
Form Shuttering for all Verticals viz. Core walls and Columns. Horizontal
shuttering was Aluma Tables mostly.
Principal employer M/s Sunland Arabtec Joint Venture, Dubai, UAE.
Ritz Carlton Hotel and Apartment is located on Sheikh
Zahid Road in DIFC area adjacent to Trade Tower in Dubai city. The project
has basements in two levels, Mezzanine, Podium and two Towers, each 17
floors with 340 Keys and 323 Flats (Hotel and Apartment Towers).
Civil and Structural works of entire Apartment block approx 135000 m2
was allotted to Pamposh by M/s Bouygues Target JV comprising of 65000 Cum of
concrete which was poured over a period of 16 months.
The apartment hotels features use of table form shuttering for repetitive
Slabs, Metallic Panel for Columns and Walls and Conventional Shuttering of
plywood and Doka in basement / Mezanine / Podium area.
Special highlights of the project are Post Tension Slabs at Technical and
Mechanical Floors at level 14 and 15. The civil works of the project was
successfully executed 5 months ahead of schedule.
Pamposh has worked on this project as a Labour Contractor on Fixed Item
Rate Basis.
Pamposh also executed 15000 Sqm of Screed, 40mm to 65 mm in Floors of the Hotel Apartment
A four star hotel of the IBIS and Novotel chain of hotels
located close to Deira City Centre Dubai. Built up area of over 18000 m2
with two number Towers of 11 levels each.
Pamposh executed the structural concrete works including reinforcement,
formwork and block masonry in 11 months. The hotel is located in the middle
of Old Dubai City which made working for it a logistical challenge.
Major Quantities of work Executed:
- Steel Reinforment: 1900MT; Concrete 20,000 m3
|

The
project features 101 mtrs tall structure with Central Core and three wings
making a Pyramid shape Five Star hotel. The hotel consists of 240 guest
rooms, nine restaurants including Spa facilities, Swimming pools and
2,50,000.00 Sq.ft. of retail space on two floors with underground parking
lot for over 1000 vehicles. In addition to the above, a separate underground
shopping arcade of 1,20,000 sq.ft. known as Khanmurjan has been developed.
M/s Khansaheb, the main contractor, engaged Pamposh to execute the
structural concrete and Masonry works of two wings of the main hotel
building including shopping mall and complete Khanmurjan plaza.
Pamposh executed Screed works approxy, 9000 Sqm with varies thickness
Quantity of work executed over the period of 18 months are :
- Steel : 4700 MT
- Concrete : 29000 Cum
|
- Block work : 23000 m2
- Plaster : 30000 m2
|
The project comprised of construction of
31 nos hurricane resistant villas, beach side Five Star Hotel and 4 Nos.
ancillary buildings housing the Central Energy Plant, Reverse Osmosis Water
Plant, Maintenance Building and Staff Building.
Total quantity of concrete poured was 38000 Cum in Foundations, frame
structure and R.C.C retaining Walls.
Finishing works comprised of Plaster works which included gypsum plaster
works, Painting and False ceiling works, tiling, marble and granite works
and corresponding water proofing works.
Since the project was Hurricane resistant, most of the walls were done in
Block Work, with the cores filled with vertically and horizontally laid
steel and finished with grout filling.
Our Clients : Carillon Construction, a U.K based company.

The
Façade of the Hotel is magnificently clad with Marble on sides and
Glazed Glass in the front. Hotel Hilton a landmark construction of a 23
storied four star hotel located centrally at Tashkent, (the capital of
republic of Uzbekistan) was undertaken by an enthusiastic team of 120
members of Pamposh on a turnkey basis. The work was executed under the
supervision of Principle Contractor, Bouygues Batiment International,
France. This International, Four Star Hotel is an architectural marvel with
all the luxuries of a Sauna, Restaurants, Bowling alleys, Shopping Arcades,
Swimming Pools etc.
Pamposh has worked on this project as Manpower Deployment and Management
Basis.

The
landmark of Ashgabat, Turkmenistan (erstwhile USSR), Hotel Nissa is a five
star hotel. This magnificent seven storied building has two basements, 150
single/double rooms, luxury suites and all modern amenities including
shopping arcades, swimming pools, sauna baths, conference halls,
discotheques etc. The Civil and Structural work includes Plumbing/
HVAC/Air-conditioning and the final finishing of Hotel Nissa.
Initially, Pamposh undertook this project in consultation with Al-Amiouny
International Contracting and Trading Company, Paris. However, Pamposh
finally completed the project on its own directly with the principal
contractors Nissa Liban, a Lebanon based organization.